The finishes schedule your builder stops ringing you about

Every designer has taken that call. Someone's on site, the tiler starts tomorrow, and the question is some version of “which one's going in the ensuite?” The answer exists — it's in a saved quote, a Pinterest board, an email thread from March, and your head. Which means it doesn't exist.

A finishes schedule is how the answer gets out of your head and onto one document: every surface in every room, coded, specified, and issued — so the person holding the trowel and the client approving the spend are looking at the same sheet you are.

Plenty of templates for this are sold on Etsy for the price of a nice candle. Ours is free, and it’s built the way schedules are issued on real jobs — reference codes, a revision register, and an FF&E schedule alongside it. New to the format? What a finishes schedule is (and how to build one) walks through it.

resource-finishes-template-hero

What’s inside

What’s inside

Four tabs, structured like a document you’d issue — not a list you’d lose:

  • 1. Schedule info & revisions

    Project details plus a proper revision register: Rev A, Rev B, date, issued to, what changed. The unglamorous table that settles every “but that's not the version I have” argument.

  • 2. Finishes schedule

    Room-by-room surfaces — walls, floors, ceilings, joinery, splashbacks, hardware — each line carrying a reference code (FL-01, WA-02), product, manufacturer, supplier, product code, finish/colour, size, quantity, who supplies it, and status.

  • 3. FF&E schedule

    The loose items — furniture, lighting, rugs, mirrors, window treatments — same code discipline (FF-01, LT-02), with dimensions and supplier detail. Finishes and FF&E are different documents that live on the same job; you get both.

  • 4. How to use

    A one-page quickstart including the reference-code legend, so codes on the schedule match codes on your drawings.

Peek inside the file

Both formats — Google Sheets and Excel — identical structure, dropdowns and status formatting included, print-ready at A4 landscape.

The schedule lists every finish; the spec sheet template is its companion — one page per product with the manufacturer, SKU, dimensions and finish, cross-referenced to the same codes.

Get the template

Free — we’ll send the Excel file and a short guide to using it. Works in Excel, Google Sheets, and Numbers.

Instant download. No spam — just the template and the occasional genuinely useful thing.

A finishes schedule example

Here is what one looks like when it is doing its job. Four rows from the Harborview Residence schedule that ships inside the template, the same demo project as our budget and spec sheet templates.

Anatomy of a finishes schedule rowAnatomy of a finishes schedule rowEvery surface, coded, specified and issued. The code on the schedule is the code on the drawing.CODEROOMSURFACEPRODUCTSUPPLIERFINISH / COLOURSIZEQTYSUPPLIED BYSTATUSFL-01Living RoomFloorEngineered oak flooringHavwoodsSmoked oak, oiled190×1900 mm42 m²ContractorApprovedWA-02Dining RoomWallsWallpaper, feature wallPhillip JeffriesGrasscloth, Bone914 mm roll4 rollsDesignerFor approvalWA-01Home OfficeWallsInterior paint, wallsDuluxNatural Whiteper drawing46 m²ContractorSpecifiedJN-01Living RoomJoineryBuilt-in shelving unitMeridian MillworkOak veneer, mattper drawing1 setDesignerOrderedReference codeFL floor · WA wall · JN joinery · HW hardware. Matches thedrawing, so nobody guesses which oak.Specification, not priceProduct, supplier, finish, size. Money lives in thebudget, not here. This document gets issued.Status, liveSpecified → for approval → approved → ordered → installed.The column that ends the version call.REVISION REGISTERRev A28 AugIssued for approvalto ClientRev B10 SepIssued for constructionto BuildRight ConstructionsIssue a revision, log it, and the “that’s notthe version I have” argument is over before itstarts.mortar.design · free template at /resources/finishes-schedule-template
Anatomy of a finishes schedule row: four rows from the template, with the reference code, the specification columns, the status and the revision register called out.

The three things to notice:

  • The code does the talking.FL-01 on the schedule is FL-01 on the floor plan, FL-01 on the spec sheet and FL-01 on the tiler’s quote. Nobody has to describe “the lighter oak, not the one from the first meeting”.
  • It is a specification, not a budget. Product, supplier, finish, size, quantity, who supplies it. No prices. This document gets issued to the builder and shown to the client, so the money stays in the budget where you control who sees it.
  • Status is a column, not a memory. Specified, issued for approval, approved, ordered, installed. When the tiler rings, the answer is in the row.

The same rows, as they appear in the template

CodeRoomSurfaceProductSupplierFinish / colourSizeQtySupplied byStatus
FL-01Living RoomFloorEngineered oak flooringHavwoodsSmoked oak, brushed & oiled190 × 1900 mm boards42 m²ContractorApproved
FL-03Primary BedroomFloorWool carpetHarvey Norman CommercialVelluto, PumiceBroadloom 3.66 m22 m²ContractorIssued for approval
WA-01Home OfficeWallsInterior paint, wallsContractor supplyDulux Natural White, low sheen—46 m²ContractorSpecified
WA-03Powder RoomWallsZellige wall tileClé TileWeathered White, gloss100 × 100 mm12 m²DesignerApproved
CL-01Living RoomCeilingCeiling paintContractor supplyDulux Vivid White, flat—38 m²ContractorApproved
JN-01Living RoomJoineryBuilt-in shelving & media unitMeridian MillworkAmerican oak veneer, clear mattPer shop drawings1 setDesignerOrdered
BT-01Powder RoomBenchtopVanity top, natural stoneCDK StoneElba marble, honed, 20 mm900 × 480 mm1 eachContractorApproved
HW-02Powder RoomHardwareBrassware, basin set & accessoriesWaterworksHenry, aged brass—1 setDesignerInstalled

Status chips: Approved and Installed render green, Issued for approval amber, Ordered blue, Specified grey. Same colours as the template’s conditional formatting, so what you see here is what you get in the file.

The template has 25 rows like these across six rooms, plus a 14-row FF&E tab for the loose items. What a finishes schedule is, and how to build one from scratch covers the method; this page gives you the document.

One room, every surface

A room finishes schedule is the same information turned sideways: one room down the side, every surface across the top, a code in each cell. Builders like this view because it reads like the room they are standing in. Use it as a completeness check: an empty cell is a decision you have not made yet.

Harborview ResidenceFloorWallsCeilingJoineryBenchtop / splashbackHardware
Living RoomEngineered oak flooring, HavwoodsInterior paint, Dulux Natural WhiteCeiling paint, Dulux Vivid WhiteBuilt-in shelving & media unit, Meridian Millwork—Door hardware, Lotus lever, Designer Doorware
Dining RoomEngineered oak flooring, HavwoodsWallpaper feature wall, Phillip JeffriesCeiling paint, Dulux Vivid White———
Entry & HallwayEngineered oak flooring, Havwoods—Ceiling paint, Dulux Vivid White———
Primary BedroomWool carpet, Cavalier BremworthInterior paint, Dulux Pale TendrilCeiling paint, Dulux Vivid White——Wardrobe pulls, Lo & Co
Home Office—Interior paint, Dulux Natural WhiteCeiling paint, Dulux Vivid WhiteCustom bookshelves, Meridian Millwork——
Powder RoomPorcelain floor tile, ArtedomusZellige wall tile, Clé TileMoisture-resistant ceiling paint, DuluxCustom vanity, Meridian MillworkVanity top, Elba marble, CDK StoneStone splashback, Elba marble, CDK StoneBrassware, Henry aged brass, Waterworks

Hover or tap a code to see the product behind it.

The template’s Finishes Schedule tab is the long-form version. Filter by room and you get this matrix for free.

Finishes schedule, finish schedule, schedule of finishes

Three names, one document. Australian and UK practices say finishes schedule or schedule of finishes; American architects usually say finish schedule (singular), and in construction documents it often appears as a room finish schedule on the drawing set itself. Interior designers everywhere mean the same thing: the list of every built-in surface, coded and specified.

What it is not: an FF&E schedule, which lists the loose furniture, lighting and fittings that get placed in the room afterwards. Both live on the same job and they are easy to confuse, which is why the template includes both as separate tabs. What is FF&E? draws the line properly.

What goes on it, and what doesn’t

Every surface that gets built in, grouped by the code prefix the template uses:

PrefixCoversTypical examples
FLFloorsTimber, tile, carpet, stone, vinyl
WAWallsPaint, wallpaper, tiles, panelling, feature cladding
CLCeilingsPaint, battens, acoustic panels
JNJoineryCabinetry, wardrobes, shelving, vanities
STSkirting and trimSkirting, architraves, cornice
BT / SPBenchtops and splashbacksStone, laminate, tile, glass
HWHardwareHandles, hinges, tapware if not on the plumbing schedule
WTWindow treatmentsBlinds, drapery tracks, sheers
LTBuilt-in lightingDownlights, strip lighting (pendants go on the FF&E tab)

What stays off: prices, margins and supplier trade terms. Those belong in the budget template. And loose items (sofas, rugs, pendants, mirrors) go on the FF&E tab, not here.

The code on the schedule is the code on the drawing.

That sentence is the whole system. FL-01 on the plan, FL-01 on the schedule, FL-01 on the spec sheet and FL-01 on the tiler's quote, so nobody on site has to guess which oak.

Reference codes, matched to your drawings

Why we’re giving it away

Honestly useful on its own — until it strains

Mortar is project and budget management for interior designers. The room-by-room item lists at the centre of Mortar are, structurally, a finishes schedule — with the parts a spreadsheet can’t do: client approvals on each item, trade pricing your client never sees, and a live status instead of a saved-as-final-v3 file.

So the template is free, and honestly useful on its own. When it starts to strain — three concurrent projects, a client who wants to approve selections without seeing supplier names, a revision you issued from the wrong file — you’ll already know what we make. A few emails on running specifications well, then we leave you alone. If budgets are the half you wrestle with, the budget template is this document’s other half.

FAQ

What's the difference between a finishes schedule and an FF&E schedule?
Finishes are the surfaces that get built in — flooring, wall treatments, tiles, joinery, hardware. FF&E is what gets placed in the room afterwards — furniture, fixtures, equipment. Contractors price and build from the finishes schedule; procurement runs off the FF&E schedule. This template includes both as separate tabs because that's how they're used.
What are the reference codes for?
Cross-referencing to drawings. “FL-01” on the schedule and “FL-01” on the floor plan means nobody has to guess which oak goes where. The template ships with a standard prefix legend (FL floors, WA walls, CL ceilings, JN joinery, HW hardware, FF furniture, LT lighting…) — change it to match your studio's convention.
Should the schedule show prices?
Generally no — a finishes schedule is a specification document, not a budget, and it’s often handed to contractors and clients. Money lives in your budget. (If you need a client-ready budget, that template is here.)
Excel or Google Sheets?
Both included, identical. Sheets is easier to keep current with an assistant or on site from a phone; Excel is better offline. If more than one person touches it, use Sheets — a finishes schedule with two divergent copies is worse than none.
Can you give an example of a finish schedule?
Yes, the eight rows above are lifted straight from the template, and the download has 25 rows across six rooms. Each row carries a code, the room, the surface, the product, supplier, finish, size, quantity, who supplies it and a status.
What is a schedule of finishes?
The same document under its Australian and UK name: a room-by-room list of every built-in surface, with a reference code per line so the schedule, the drawings and the spec sheets all agree. Builders price and build from it; clients approve from it.
What are finish schedules in construction?
On a construction drawing set, the finish schedule is usually a table on the plans listing floor, wall, ceiling and base finishes per room. An interior designer's finishes schedule is the richer version: product, supplier, finish, size and status, maintained as the job changes, with a revision register so everyone knows which issue they hold.
Is there a finishes schedule template for Excel?
This one. You get the Excel file and a Google Sheets copy, identical structure, with dropdowns and status colouring already set. It prints at A4 landscape.