mortar.design

Features

The finishes schedule that stops being a document

One item becomes the budget line, the schedule row, the client's approval, the purchase order line and the invoice line.

Add it once, everything else keeps up · 0:51

finishes-hero

A finishes schedule is where every studio's system cracks first. The builder has Rev A, the client marked up Rev B, and the real answers live in your head and a spreadsheet called FINAL-v3. Every change means re-typing reality into a document that was stale before you saved it.

In Mortar, the schedule isn't a document you maintain. It's the live state of the project — and the document gets generated from it, correct on the day you issue it.

Start free — 7 days, no card · Just want the spreadsheet? Free finishes schedule template · New to the format? What is a finishes schedule?

finishes-item-drawer

One row per finish, coded like your drawings

Every item lives in a room with a reference code — FL-01, WA-02 — and Mortar suggests the next one in sequence. Application, finish and colour, supplier, product code, dimensions, quantity and unit, status from specified through issued to installed. Paste a product URL and the details fill themselves in.

Approvals land on the schedule, not in your inbox

Your client gets their own login and sees the selections — never your trade pricing, and if you choose, never your supplier names. They approve or comment per item, and the schedule updates itself. The chasing stops because there's nothing to chase.

finishes-revisions

Issue it in one click — and freeze it forever

Export a room-grouped schedule as PDF: the designer version with everything, or a client-safe version filtered through that client's exact visibility settings. CSV for anyone who insists on a spreadsheet.

And when you issue properly: Rev A. Mortar freezes exactly what the schedule says into a permanent record — issued revisions can never be edited or deleted, and you can see what changed since. No more arguments about which version the builder has.

Bring the schedule you already have

Import your existing FF&E spreadsheet — including our free template — and Mortar builds the rooms and lines for you. Column mapping takes about two minutes, and it remembers your format for next time.

Start free — 7 days, no card

FAQ

Can my client see trade pricing or suppliers?

Only if you want them to. Price visibility (full / totals only / hidden) and supplier visibility are set per client link — and the client-safe export uses the same rules. Your margins never appear anywhere client-facing, ever.

Does it replace my drawings?

No — it cross-references them. The reference codes on the schedule are the codes on your plans, so "FL-01" means the same thing on site and on screen.

What about FF&E?

Same system. Finishes and loose items live as rooms and items with the same codes, statuses and approvals — the export groups them by room.

See it in action

Watch how it works

Issue a revision, see what changed · 0:43Rev A stays frozen as it went out. Issue Rev B and the schedule shows exactly what changed, item by item.
Find the items waiting on the client · 0:31Filter the schedule by status and chase just the items waiting on a decision.
Export the schedule for the builder, or the client · 0:45Two PDF versions of the same finishes schedule: the designer copy with costs and markup, and the client copy without.

Free template

Prefer the spreadsheet for now? It's free.

The finishes schedule template — reference codes matched to your drawings, a revision register, and an FF&E tab — built the way schedules are issued on real jobs.

Want the full story first? See what’s inside the free finishes schedule template.

Instant download. No spam — just the template and the occasional genuinely useful thing.

Run your next project on one list. Get your evenings back.

Load a real project into the trial. Paste a product link and watch it fill itself in, then open the portal your client would see. You'll know within a week.

  • Fully self-serve
  • Cancel anytime